QUALICUM BAY - HORNE LAKE WATERWORKS DISTRICT - Inspection Report
This facility was given low hazard rating. More info
Inspection Information
Facility Type301-10000 (DWT)
Inspection typeRoutine
Inspection dateNovember 23, 2017
Follow-up RequiredNo
Violations: No violations were found during the inspection.
Comments
Bacteriological Samples - 5 routine sample sites, 2 samples/week submitted to Island Health. Chemical Analysis for each well conducted November 18, 2016. Manganese is elevated in all three wells. Manganese aesthetic objective (AO) is 0.05 mg/L, Well #1: 0.13 mg/L, Well #2: 0.115 mg/L, Well #3: 0.098 mg/L. Well Protection Plan - completed July 31, 2017 by Waterline Resources Inc. Island Health expects QBHL to implement recommendations outlined in the Well Protection Plan, and develop measurable objectives to evaluate the plans effectiveness. Emergency Response Plan - ensure plan is up to date, including recommendations from Wellhead Protection Plan. Documents to be aware of: -Drinking Water Treatment Objectives (Microbiological) for Groundwater. -BC Guidelines (Microbiological) on Maintaining Water Quality in Distribution Systems.